The designation of Site-96 as an incident requires strict adherence to Protocol Gamma. All personnel assigned to Site-96 must undergo intensive training on the parameters of this protocol. Any deviation from established procedures may result in escalation of the anomaly.
Primary objectives of Prot
This record details the events logged within Site-96 on timespan. The data contained herein is top secret and access is restricted to designated agents only. Any breach of this protocol will be met with swift disciplinary action. The log starts on date1 and extends through timestamp.
Entry 1: Desc
On date, a series of anomalous events transpired within the confines of Site-96. At approximately 08:15 hours, a gradual shift in energy levels was detected. Contained within the restricted area was a recently activated anomaly designated as SCP-XXXX. Additional analysis into this occurrence is cur
Date: 27/10/2023. Time: 14:37 CST. Location: Containment Zone Bravo, Site-96. Personnel involved: Dr.Brown, Agent Lee, and security personnel unit 012, unit B875, unit C931.
An event of concern occured at approximately 4:32 PM. Initial report indicates a failure of containment within the area desi